DEFINE Study - Revamp of Boiler 4 in Refinery Burghausen

Last update: Jul 29, 2015 Last update: Jul 29, 2015

Details

Locations:Germany
Start Date:Jan 1, 2012
End Date:Dec 31, 2012
Sectors:Energy, Research
Energy, Research
Categories:Consulting services
Funding Agencies:
Date posted:Jan 22, 2015

Associated funding

Associated experts

Description

The existing HD-steam boiler in the Burghausen Refinery has to be equipped with blending burners oil/gas. Based on an existing study all necessary actions have to be elaborated within a feasibility study. FEED services will be offered on an optional basis.

Technical data:

    Steam capacity: 20 / 110 t/h
    Pressure: 53 / 62 bara
    Temperature: 375 / 400°C
    Total power of dual fuel burners:  95 MW

ILF Sevices:

    Project Management
    Site survey
    Evaluation of different options for natural gas supply
    3D Model design in PDS
    PID's in SPPID
    HAZOP
    Functional requirements for control system
    Tender for 3 LLI's incl. recommendation to award the contract.

Client: OMV Deutschland GmbH.