Assessment of the existing tailing dam for stability of the dam wall, slope stability to determine life time of existing dam facility. Tailing Dam capacity enhancement measures
Details
Locations:Oman
Start Date:Jul 13, 2011
End Date:Unknown
Sectors: Civil Engineering, Water & Sanitation
Description
Project Number: 1125
Client Name: Mawarid
Narrative Decription of the Project:
Renardet reviewed the stability of the existing tailings dam and designed features to allow capacity enhacement of the existing operations. The works includes raising the earthfill embankment to increrase capacity, installation of a waterproof membrane to the new areas as well as the higher slopes, design of a new access road at a higher elevation and new delivery and return pipework. Coordination between the production facility and the construction team is critical to minimise downtime.
Description:
1) Stability Analysis and embankment design
2) Drainage network
3) Pipline flow analysis
4) Road works and water recovery system design
5) Construction supervision
Services:
- Preliminary Design
- Final Design-Design Review
- Supervision
Project Status: Completed