Other

Assessment of the existing tailing dam for stability of the dam wall, slope stability to determine life time of existing dam facility. Tailing Dam capacity enhancement measures

Last update: Mar 30, 2016 Last update: Mar 30, 2016

Details

Locations:Oman
Start Date:Jul 13, 2011
End Date:Unknown
Sectors:Civil Engineering, Water & Sanitation
Civil Engineering, Water & Sanitation
Categories:Consulting services
Funding Agencies:
Date posted:Mar 21, 2016

Associated funding

Associated experts

Description

Project Number: 1125

Client Name: Mawarid

Narrative Decription of the Project:

Renardet reviewed the stability of the existing tailings dam and designed features to allow capacity enhacement of the existing operations. The works includes raising the earthfill embankment to increrase capacity, installation of a waterproof membrane to the new areas as well as the higher slopes, design of a new access road at a higher elevation and new delivery and return pipework. Coordination between the production facility and the construction team is critical to minimise downtime.

Description:

1) Stability Analysis and embankment design
2) Drainage network
3) Pipline flow analysis
4) Road works and water recovery system design
5) Construction supervision

Services:

- Preliminary Design

- Final Design-Design Review

- Supervision

Project Status: Completed

Want to unlock full information?
Member-only information. Become a member to access projects awards, find the right consortia partners, subcontractors and more.