Rehabilitation and Strengthening of Water Supply System Under K-III Project

Last update: May 11, 2016 Last update: May 11, 2016

Details

Locations:Pakistan
Start Date:Unknown
End Date:2012
Contract value: 2,483,360,000
Sectors:Civil Engineering, Water & Sanitation
Civil Engineering, Water & Sanitation
Categories:Consulting services
Funding Agencies:
Date posted:May 11, 2016

Associated funding

Associated experts

Description

Client: Karachi Water & Sewerage Board 

Description:

  • Producing an overall existing water supply asset map of 18 towns of Karachi city, covering conveyance and distribution system with particular reference to water trunk mains ranging 33” dia to 72” dia.
  • Leakage detection survey showing previously repaired leaks pin-pointing places where frequent leakages occur.
  • Prepare an aging plan of the transmission and water distribution system to identify such portions of the system where it has completed economic design life and where there are visible signs of deterioration and damage resulting in water loss.
  • Devise the concept of metering in the context to ensure equitable distribution of water and measured flows to the 18 towns of Karachi.
  • Complete detail design and preparation of engineering estimates.
  • Provide specialist services for all contracts with an integrated team of experienced and qualified engineers.
  • Supervision of commissioning &setting to work to the specified standard.

Fee: Rs. 97.24 million

Completion: 2012 (Extended) 