Green Climate Fund

Energy Audit Engineer to Undertake Engineering Assessment of the Control Systems to Minimize Power Consumption at the Bridgetown Sewage Treatment Plant (bstp)

Last update: Jan 8, 2025 Last update: Jan 8, 2025

Details

Location:Barbados
Barbados
Category:Consulting services
Status:Closed
Sectors:Energy, Audit
Languages:English
Funding Agency:
Contracting authority type:Development Institution
Eligibility:Individual
Budget:N/A
Date posted: Jan 8, 2025

Attachments 3

Associated Awards

Project cycle timeline

STAGES
EARLY INTELLIGENCE
PROCUREMENT
IMPLEMENTATION
Cancelled
Status
Programming
Formulation
Approval
Forecast
Open
Closed
Shortlisted
Awarded
Evaluation

Quick summary

AI generated
Objectives: To implement energy-efficient technologies in the upgraded treatment processes at Bridgetown Sewage Treatment Plant (BSTP) to reduce the overall energy footprint and decrease greenhouse gas (GHG) emissions. This involves conducting an engineering assessment of the control systems to minimize power consumption and implementing automated controls and energy efficiency measures, including Variable Frequency Drives (VFDs) and energy-efficient pumps.
Eligibility criteria: Suitably qualified Companies/Firms must submit a Letter of Motivation, Curriculum Vitae or resume, National ID, Completed Qualification Information Form, and a Financ...

Description

Energy Audit Engineer to Undertake Engineering Assessment of the Control Systems to Minimize Power Consumption at the Bridgetown Sewage Treatment Plant (bstp) Closing Date: January 27, 2025 Details: The Caribbean Community Climate Change Centre (the CCCCC
Want to unlock full information?
Member-only information. Become a member to access this information. Procurement notices from over 112+ donors and banks are available here