World Bank HQ

Design, Supply, Installation, Testing, and Commissioning of 5MWp Solar PV Power Plant with 11 MWh of Battery Energy Storage System for Baidoa Electric Company (BECO), Baidoa City, Somalia

Last update: Nov 10, 2025 Last update: Nov 10, 2025

Details

Location:Somalia
Somalia
Category:Goods
Status:Awarded
Sectors:Energy
Languages:English
Funding Agency:
Contracting authority type:Government agency
Eligibility:Organisation
Budget:N/A
Date posted: Jan 30, 2025

Attachments 2

Associated Awards

Project cycle timeline

STAGES
EARLY INTELLIGENCE
PROCUREMENT
IMPLEMENTATION
Cancelled
Status
Programming
Formulation
Approval
Forecast
Open
Closed
Shortlisted
Awarded
Evaluation

Associated tenders 1

Status

Date

Quick summary

AI generated
Objectives: The objective of the tender is to carry out the design, supply, installat...
Eligibility criteria: This tender is open to all eligible bidders as per the World Bank's "Procurement Regulations for IPF Borrowers" and involves international competitive procurement ...

Description

Request for Bids

Plant
Design, Supply Installation, Testing and

Commissioning

(Two-envelope Bidding Process, Without Prequalification)

Employer:

Ministry of Energy and Water Resources, 

Project:     

Somali Electricity Sector Recovery Project “SESRP”

Contract title:

Design, Supply, Installation, Testing, and Commissioning of 5MWp Solar PV Power Plant with 11 MWh of Battery Energy Storage System for Baidoa Electric Company (BECO), Baidoa City, Somalia. 

Country:

Federal Government of Somalia

Grant No.:

D931-SO

RFB No:  

SO-MOEWR-459163-CW-RFB

Issued on:  

31 January 2025

  1. The Federal Government of Somalia has receivedfinancing from the World Bank toward the cost of the Somali Electricity Sector Recovery Project and intends to apply part of the proceeds toward payments under the Contracts for Design, Supply, Installation, Testing, and Commissioning of 5MWp Solar PV Power Plant with 11 MWh of Battery Energy Storage System for Baidoa Electric Company (BECO), Baidoa City, Somalia. For this contract, the Borrower shall process the payments using the Direct Payment disbursement method, as defined in the World Bank’s Disbursement Guidelines for Investment Project Financing except for those payments which the contract provides to be made through letter of credit.

The Ministry of Energy and Water Resources now invites sealed Bids from eligible Bidders for provision of Design, Supply, Installation, Testing, and Commissioning of 5MWp Solar PV Power Plant with 11 MWh of Battery Energy Storage System for Baidoa Electric Company (BECO), Baidoa City, Somalia. as detailed in the table below

Bidding will be conducted through international competitive procurement using a Request for Bids (RFB) as specified in the World Bank’s “Procurement Regulations for IPF Borrowers” dated September 2023 (“Procurement Regulations”) and is open to all eligible Bidders as defined in the Procurement Regulations.

4.        Interested eligible Bidders may obtain further information from the Interim Project Coordinator, Project Implementation Unit, Ministry of Energy and Water Resources, email address: sesrp.procurement@gmail.com and inspect the bidding document during office hours from 8.30am to 4.00pm at the address given below. 

5.        The bidding document in English may be obtained free of charge by interested eligible Bidders on the https://sesrp.moewr.gov.so/company-overview/careers/ website or can be provided upon submission of a written application to the address below.

6.        A Pre-bid conference shall be conducted virtually by the Employer, the Ministry of Energy and Water Resources, Mogadishu, Somalia on 17 March 2025 at 10.30 am Mogadishu Local Time through the following link:

            https://teams.microsoft.com/l/meetup-join/19%3ameeting_N2I4NjgyZGItNDA3My00ZDA0LWE2ZTEtZjJjYWQyYTc5ODA5%40thread.v2/0?context=%7b%22Tid%22%3a%224b471a60-88ee-4c96-87e7-c9beee1ca249%22%2c%22Oid%22%3a%22d72bc85d-7b1f-4248-8f42-6f8a6ff74abb%22%7d 

           No site visits shall be organized by the employer, but bidders are encouraged to contact Baidoa Electric Company (BECO) headquarters for site visits to familiarize themselves fully with the scope of work envisaged. 

7.        Bids must be delivered to the address below on or before 10.30 a.m. on 17 April 2025. Electronic bidding will not be permitted. Late Bids will be rejected. The outer Bid envelopes marked “ORIGINAL BID”, and the inner envelopes marked “TECHNICAL PART” will be publicly opened in the presence of the Bidders’ designated representatives and anyone who chooses to attend, at the address below, at 11.00 am on 17 April 2025. All envelopes marked “FINANCIAL PART” shall remain unopened and will be held in the safe custody of the Employer until the second public Bid opening. 

8.        All Bids must be accompanied by a Bid-Securing Declaration using the form included in Section IV, Bidding Forms.

9.        Attention is drawn to the Procurement Regulations requiring the Borrower to disclose information on the successful bidder’s beneficial ownership, as part of the Contract Award Notice, using the Beneficial Ownership Disclosure Form as included in the bidding document.

10.      The address(es) referred to above is (are):

Interim Project Coordinator,

Project Implementation Unit “PIU” Office, 6th Block, 2nd Floor,

Somali Electricity Sector Recovery Project, Ministry of Energy and Water Resources,

Airport Road, next to Ali Jim’ale Mosque,

Waberi District, Mogadishu, Somalia

Email address: sesrp.procurement@gmail.com. Copy: dg@moewr.gov.so 

Contact No: +252 770 980 456

Website: https://sesrp.moewr.gov.so/company-overview/careers/

Want to unlock full information?
Member-only information. Become a member to access this information. Procurement notices from over 850+ sources of tenders and grants published by donors, development banks, foundations, and international financial institutions (IFIs) are available here.
tender Background

About the Funding Agency

The World Bank (USA) is part of an international financial agency that makes loans and grants to governments in low- and middle-income countries to fund capital projects. The United States was a driving force behind the founding of the World Bank in 1944 and it is still the World Bank's largest shareholder today.

The United States contributes to tackling critical international development concerns through the World Bank Group and has a long history of generously supporting the objectives of the World Bank Group and has been a champion of the International Development Association (IDA) which provides low-interest loans and grants to the world's poorest countries. The key U.S. priorities at the World Bank include a multilateral health and economic response to COVID-19, debt sustainability and transparency, promoting governance and fighting corruption, ending energy poverty and supporting a strong emphasis on accountability, transparency and development impact.

About the Sectors

Energy

Involves the production, transformation, transportation, and distribution of energy from renewable and non-renewable sources.


Key areas:
  • Renewable and non-renewable energy production
  • Energy infrastructure and distribution systems
  • Power generation and energy supply solutions