Project ID: P133591
Borrower/Bid No: MoWIE/OWNP/CON/QCBS/06/2014
MoWIE/OWNP/CON/QCBS/06/2014
Consultancy Services for Detail Design, Tender Document Preparation and Constructions Supervision & Contract Administration for Surface Water Resources of the Addis Ababa Water III Project.
The tender notice has been cancelled as of March 13th 2015 and remains for information purposes only. Please, do not respond.
Addis Ababa Water and Sewage Authority (AAWSA) is mandated, among other things, to plan, develop and maintain the city water and sewerage infrastructure. AAWSA is the sole provider of potable water for the city, the system of which has developed over the last 70 years with the exploitation of surface water and groundwater resources both within and outside the municipal boundaries. In recent years, the increased pace of economic developments of the capital city has placed continuing pressure on the water supply system to maintain pace with the resulting increased demands. With the aim of meeting the future water demand of the city, the AAWSA has secured a budget from Ministry of Water Irrigation and Energy under One WaSH National Program part of which is paid under contract Phase- I: Consultancy Service for Detail Design and Tender Document Preparation; and Phase-II: Consultancy Services for Construction Supervision and Contract Administration of Surface Water Resources of the Addis Ababa "Water III Project". The contract will be executed by the Government of Ethiopia through Addis Ababa Water and Sewage Authority's Water and Sanitation Development & Rehabilitation Project Office (AAWSA-PO).
The Addis Ababa Water Supply Project Phase III (commonly called Water III Project) was initiated by AAWSA 30 years ago with the purpose of planning, designing and constructing water supply systems that will effectively meet the growing water demands of the city. With a broad aim of bringing this project into implementation phase, the AAWSA-PO is therefore inviting potential interested international/national firms to undertake the consultancy services in two separate phases mentioned above. The objectives and scopes of the services are as outlined below:
Phase-I: Detail design and Tender Document Preparation of Surface Water Resources of the Addis Ababa Water III Project (Sibilu Dam and Ancillary Structures, Pumping Stations, Wesserbi Treatment Plant, Transmission Mains and Distribution Systems)
Objective of the study
*To prepare and operate quality assurance plans throughout the assignment;
*To carry out a comprehensive review of the Detailed Design of Sibilu Dam, Pumping stations, and transmission systems (2005) in order to address any short coming or deficiencies in order to assume full professional liability for the detailed design of the dam and its ancillary structures;
*To review recent findings in relation to hydrology and other issues, including reducing the impact of siltation;
*To review current situation at the dam site and incorporate any design changes necessary since the previous design was completed;
*To prepare up to date Aerial and Topographic Maps for the Sibilu Dam site and overall project area;
*To carry out geological and geotechnical studies and other surveys as required;
*To undertake detail environmental, social impact,costs and mitigation measures (Liaising of consultant in separate assignment is possible);
*To Prepare Draft and Final Detailed Designs for the dam and ancillary structures, pump stations, treatment plant, transmission mains, Construction Plan and Tender Documents including engineering cost estimates of all contract packages including dam, and associated works;
*To Prepare Draft and Final Outline Designs for the WTP and ancillary structures, and Tender Documents (Design Build – FIDIC Yellow Book) including engineering cost estimates of all contract packages including WTP, and associated works
*To Prepare Dam Safety, Instrumentation, and emergency preparedness plans with operation and maintenance manuals.This should cover Dam operating aspects e.g. operating rules for normal and emergency (flood) conditions and procedures for filling and emptying the hydraulic systems, and any other operating data not in the Contractors' Operation and Maintenance manuals;
*To Prepare an Operation and Maintenance manual for the WTP. In particular, this should cover WTP operating aspects e.g. operating rules for normal and emergency conditions and procedures for filling and emptying the hydraulic systems, and any other operating data not in the Contractors' Operation and Maintenance manuals.
Scope of the Consultancy Service
Under phase-I, the scope of the consultancy service is grouped into two components:
(i) Design component:
The following scope of services is intended to provide an overview of the activities to be performed by the consultant in preparing Detailed Design which also form basis of part of the expected outputs from the Consultant.However, it is not intended to be an exhaustive listing of the required work activities as it will be supplied to short listed consultants through RFP at the later stage and the candidate consultants are free to improve the list thereafter.
*Design review of the surface water components of the recent water III project report;
*Detailed Design of Sibilu dam and ancillary structures (Intake tower, access road, pump stations, Spillway, transmission main to treatment plant, and dam instrumentations etc.);
*Detailed Design of Wosserbi Water Treatment Plant (stilling basin, clarifiers, filters, backwash water reservoirs, clear water tank, sludge dewatering plant etc.);
*Detailed Design of Transmission mains from treatment plant to Service reservoir (with evaluation of tunneling option and booster pumping arrangements);
*Design of Service reservoirs with distribution options to end users;
*Mapping of the Project Area;
*Geological, Geotechnical and Seismological Investigation at all the sites;
*Supplemental hydrological assessment;
(ii) Procurement/ Tender Document preparation component:
The potential Consultant is expected to show its capability to prepare contract packages and tendering documents for all civil works, equipment and associated services according to the QCBS procurement guidelines. The Consultant will prepare confidential work package documents and provide (indicative but not limited to) the following services:
*Contract packaging and Draft Procurement Plan
*Bidding documents for works and goods (including prequalification documents and notices)
*Engineering cost estimates for the dam and associated structures including access roads, power, communication, housing, offices and other facilities.
*Bidding documents for works and goods (including prequalification documents and notices) – FIDIC Yellow Book.
*Engineering cost estimates for the pump station, WTP, transmission mains and associated structures including access roads, power, communication, housing, offices and other facilities.
*Preparation of construction Plan;
*Provision of Tendering assistance;
*During tender period, the consult shall set prequalification criteria and prepare response to tender queries in collaboration with AAWSA-PO.
*Preparation of technical evaluation criteria in collaboration with AAWSA-PO making clear recommendation for the award of contract
Phase-II: Construction Supervision and Contract Administration of Surface Water Resources of the Addis Ababa Water III Project (Sibilu Dam and Ancillary Structures, Pumping Stations, Wesserbi Treatment Plant, Transmission Mains and Distribution Systems)
This phase is entirely dependent on successful completion of the tasks under phase –I and availability of additional fund for the activities. However, the competent firms are expected to show their interest whether they are capable to undertake the phase II service through standardized EOI. During project implementation period the consultant shall provide all necessary services as needed to facilitate project progress. These shall include, but not limited to the following:
*Supervise the construction of the dam and ancillary structures;
*Carry out periodic Safety inspections of the dam after completion;
*Supervise the Construction of the WTP and ancillary structures;
*Supervise the commissioning of the WTP and ensure the performance specifications are met;
*Carry out periodic inspections of the WTP after completion and review the water quality of the treated water;
*Carry out the duties of the "Engineer" and "Engineer's Representative" as specified in the construction contracts and FIDIC Conditions of Contract, and the duties of the Environmental Control Officer, as specified in the Environmental Management Plan.
*Issue to the Employer monthly and Quarterly Progress Reports and other technical and financial reports in a format approved by the AAWSA-PO.
*Review any site testing procedures and supervise actual acceptance tests on site carried out by the Contractor;
*Review Contractor's claims and advise what amount, if any, the Engineer considers due Provide written reports and advice on individual claims. Provide written advice on any claims negotiations and support as requested. Provide written reports and advice and support as requested in any preparations and procedures for the Dispute Adjudication Board (DAB);
*The method of selection is quality and cost based selection (QCBS)
General Information to the EOI:
*Consultants who had poor performance and bad conduct in the previous relation with the project office cannot participate in this request for EOI.
*Consultants who have currently contractual agreement with the project office should perform at least;100% for small size projects,85% for Medium size projects and 75 % Large size projects if not they cannot participate in this bid.
*Interested consulting firm can obtain further information from the project office at the address below during working hours.
*Standardize Proposals of Expression of Interest (EOI) documents may be delivered to the address below on or before 15th April 201 5pm.
Addis Ababa Water and Sewerage Authority
A.A.W.S.A Water and Sanitation Development & Rehabilitation Project Office,
Megenagna-CMC Road, 300m from Megenagna Square, in front of Woreda 6 office Bole Kifleketema), AAWSA Project office Building, 3 rd floor
Contact Person -Dr.Fiseha Behulu Muluneh
Leader, Water Study, Design & Const. Supervision Process
Telephone number 251-11-8951477
fishbehulu@gmail.com
fisehabehulu@yahoo.com

The World Bank (USA) is part of an international financial agency that makes loans and grants to governments in low- and middle-income countries to fund capital projects. The United States was a driving force behind the founding of the World Bank in 1944 and it is still the World Bank's largest shareholder today.
The United States contributes to tackling critical international development concerns through the World Bank Group and has a long history of generously supporting the objectives of the World Bank Group and has been a champion of the International Development Association (IDA) which provides low-interest loans and grants to the world's poorest countries. The key U.S. priorities at the World Bank include a multilateral health and economic response to COVID-19, debt sustainability and transparency, promoting governance and fighting corruption, ending energy poverty and supporting a strong emphasis on accountability, transparency and development impact.
Focuses on protecting natural ecosystems, promoting sustainable resource management, enhancing climate resilience, and mitigating the impacts of climate change through conservation, adaptation, and low-carbon initiatives.
Encompasses initiatives that improve how organizations plan, source, and manage the purchase of goods and services to ensure value for money, compliance, and supplier performance.