
Earthquake Housing Reconstruction Project: Procurement of 5 Double Cab Pickup Vehicles for DLPIUs
- Funding agency:
- WB
- Status:
- awarded
- Location:
- Nepal

MINISTRY OF ENERGY (MoEn)
DEPARTMENT OF ELECTRICITY DEVELOPMENT (DoED)
ANAMNAGAR, KATHMANDU, NEPAL
REQUEST FOR EXPRESSION OF INTEREST (EOI) FOR
(Consulting Services – Firms Selection)
(Date of first publication: May 4, 2016)
Country: Nepal
Name of Project: Kabeli-A Hydroelectric Project
Grant No: IDA Grant No. H900-NP
Assignment Title: Cumulative Impact Assessment (CIA) for the Tamor River Basin, Environmental and Social Safeguards and Capacity Building Activities including Compliance Monitoring.
1. The Government of Nepal has received financing (grant) from the World Bank towards the cost of the Kabeli-A Hydroelectric Project (KAHEP), and intends to apply a portion of this proceeds for this consultancy services.
2. The KAHEP project aims to add hydropower generation capacity in Nepal through public private partnership and also build up capacity for hydropower development in Nepal. The MoEn Component under this project will focus on: (a) supervising, monitoring and evaluation for the implementation of KAHEP to ensure compliance with the Project Development Agreement (PDA), Environment Management Plan (EMP) and Social Action Plan (SAP); (b) building technical, environmental and social safeguards capacity of Implementing Agency (IA) on integrated river basin management and cumulative impact management for sustainable hydropower development, including development and adoption of guidelines for CIA and involuntary resettlement and livelihood restoration; inter alia.
3. The objective of this assignment is to enhance the long-term capacity of DoED and MoEn to implement the KAHEP project and also to improvethe management system for future hydropower development.
4. The consulting services ("the Services") include the Scope as follows:
i. Update the previous CIA of the KAHEP with an expanded scope from the Kabeli River to the Tamor River, considering proposed and ongoing water resources projects including transmission line and access road(s) in the watershed of the river.
ii. Building capacity of DoED/MoEn staff for coordination and management regarding CIA for water resources development in other river basins of Nepal.
iii. Review of the existing regulatory, planning and implementation framework for Hydroelectric Power Projects with the objective of developing recommendations integrating CIA in planning, preparation and implementation into the framework.
iv. Prepare Guidelines for both (i) Involuntary Resettlement for Hydroelectric Power Projects and (ii) Benefit Sharing for Hydroelectric Power Projects, and provide technical support for related capacity building.
v. Provide technical support to the DoED as it carries out its regulatory requirement for compliance supervision, monitoring and evaluation of the implementation of the PDA, EMP and SAP of the KAHEP.
5. DoED invites eligible consulting firms ("Consultants") to indicate their interest in providing the Services stated under Section 4 above. Interested Consultants should provide information/documents indicating that they have the required qualifications and relevant experience to perform the Services. Consulting firms must have been legally registered and in business for at least five (5) years prior to the last date of submission of EOI. Following documents shall be submitted along with the EOI application by all the Consulting firms:
i. At least two (2) assignments completed on EIA, SESA, CIA
ii. At least one (1) assignment on CIA completed on hydropower projects
iii. At least one (1) assignment completed on the preparation of resettlement guidelines
iv. At least one (1) project completed on the preparation of benefit sharing guidelines
v. At least one (1) project, with more than 25 MW generation capacity, completed on EIA and/or SESA studies of hydropower projects and/or hydropower development masterplans
vi. At least one (1) project completed on Environmental Audits of hydropower projects with more than 25 MW generation capacity
vii. At least 2 projects completed on compliance monitoring and/or construction supervision of hydropower projects with more than 25 MW generation capacity
Short-listing Criteria are (a. Management competency of consulting firms-core business area of the firm, number of key professional staff in-house and quality assurance plan of the firm; b. Specific experience of consulting firm-experience in EIA, SESA, CIA general as well as hydropower specific, environmental audits of hydropower projects, preparation of resettlement guidelines and benefit sharing guidelines and compliance monitoring and supervision of the hydropower projects; and c.Geographical experience of consulting firms.)
6. Short listing and selection of the Consultant will be carried out in accordance with the World Bank's Guidelines: Selection and Employment of Consultants under IBRD Loans and IDA Credits & Grants by World Bank Borrowers - January 2011, revised July 2014 ("Consultant Guidelines"). A Consultant will be selected in accordance with the QCBS method set out in the Consultant Guidelines. A brief description of the assignment can be found in the brief Terms of References (ToRs) which can be downloaded from the DoED website www.doed.gov.np..
7. The attention of interested Consultants is drawn to paragraph 1.9 of the Consultant Guidelines setting forth the World Bank's policy on conflict of interest. ..
8. Consultants may associate with other firms in the form of a joint venture or a sub-consultancy to enhance their qualifications. Experience and Qualification of other firms, whether parent or subsidiary firm, will not be considered for evaluation. Likewise, qualification and experience of the consulting firm associated as a sub-consultancy will not be considered for evaluation forshortlisting.
a. Each partner in the JV firm shall individually comply with the criteria mentioned paragraph 5.
b. Each partner of the JV firm shall meet at least one of the technical criteria mentioned in paragraph 5.
c. The combined experience of the JV partners shall meet at least 3 criteria in paragraph 5.
d. All JV firms shall submit a copy of JV agreement or memorandum of understanding (MOU) for the JV or intended JV agreement along with their EOI application.
e. An applicant shall not submit more than one (1) EOI application either as a single entity or as a partner in JV firm.
9. All submittals from the consulting firms shall be in English language.
10. Further information can be obtained at the address below.
Purushottam Acharya
Department of Electricity Development
Post Box No. 2507
576 BhaktiThapaSadak (4), Anamnagar
Kathmandu, Nepal
Phone: (977-1-) 4480326, 4479507, 4480425, 9841366749
Fax: (977-1-) 4480257
Email: [email protected], Website: www.doed.gov.np
11. Expressions of interest shall be delivered in a written form (in person, or by mail, or by fax, or by e-mail) to the address above on or before 12 hrs Nepal Standard Time on June 3, 2016. The title of the submission shall be"Cumulative Impact Assessment (CIA) for the Tamor River Basin, Environmental and Social Safeguards and Capacity Building Activities including Compliance Monitoring for DoED. DoED reserves the right to accept or reject any or all applications, or to cancel the entire proceedings without giving any reasons whatsoever.
The World Bank (USA) is part of an international financial agency that makes loans and grants to governments in low- and middle-income countries to fund capital projects. The United States was a driving force behind the founding of the World Bank in 1944 and it is still the World Bank's largest shareholder today.
The United States contributes to tackling critical international development concerns through the World Bank Group and has a long history of generously supporting the objectives of the World Bank Group and has been a champion of the International Development Association (IDA) which provides low-interest loans and grants to the world's poorest countries. The key U.S. priorities at the World Bank include a multilateral health and economic response to COVID-19, debt sustainability and transparency, promoting governance and fighting corruption, ending energy poverty and supporting a strong emphasis on accountability, transparency and development impact.
Focuses on protecting natural ecosystems, promoting sustainable resource management, enhancing climate resilience, and mitigating the impacts of climate change through conservation, adaptation, and low-carbon initiatives.
Includes measures for improving well-being, inclusion, and resilience of individuals and communities through social services and protection systems.