Share
Print

Pakistan - P154036 - Disaster and Climate Resilience Improvement Project - PK-PIU PID-154554-GO-RFB
Country: Pakistan
Project Id: P154036
Project Name: Disaster and Climate Resilience Improvement Project
Loan/Credit/TF Info.: IDA-56860
Notice Version No.: 0
General Information
|
Notice Type |
Invitation for Bids |
|
Borrower Bid Reference |
PK-PIU PID-154554-GO-RFB |
|
Bid Description |
PROCUREMENT OF INSTRUMENTS FOR UP GRADATION OF IRRIGATION RESEARCH INSTITUTE (Lot # 01 to Lot # 07) |
|
Language of Notice |
English |
|
Deadline for Application Submission Date |
2020/03/04 |
|
Local Time |
12:30 |
|
Selected category codes for product to be procured |
70171803-Flood protection or control services |
Contact Information on Advertisement
|
Organization/Department |
PIU DCRIP Punjab Irrigation Department |
|
Name |
Ahmed Ul Haq Usmani |
|
Title |
Project Director |
|
Address |
Punjab Irrigation Department, Lahore |
|
City |
|
|
Province/State |
|
|
Postal Code |
|
|
Country |
Pakistan |
|
Phone |
+924235294373 |
|
Fax |
|
|
|
|
|
Website |
Detailed Information for Advertisement
Invitation for Bids
Date:January 23, 2020
Loan No: 5686-PAK
1. The Islamic Republic of Pakistanhas received financing from World Bank toward the cost of Disaster and Climate Resilience Improvement Project (DCRIP).It is intended that part of the proceeds of this loan will be applied to eligible payments under the contract for “PROCUREMENT OF INSTURMENTS FOR UP GRADATION OF IRRIGATION RESEARCH INSTITUTE” (LOT # 01 TO LOT # 07).
2. The Project Implementation Unit (PIU) Punjab Irrigation Departmentnow invites lot wise sealed bids from eligible bidders for the supply of the following equipment as detail of lots given below.
|
Sr. # |
Contact No./Reference No. |
Contract Title |
Bid Security (PKR) |
Bid Opening Time |
|
1 |
DCRIP /GOODS/NCB/21 |
Lot # 01 |
277,000 |
01:00 PM |
|
2 |
DCRIP /GOODS/NCB/22 |
Lot # 02 |
168,000 |
|
|
3 |
DCRIP /GOODS/NCB/23 |
Lot # 03 |
98,000 |
|
|
4 |
DCRIP /GOODS/NCB/24 |
Lot # 04 |
50,000 |
|
|
5 |
DCRIP /GOODS/NCB/25 |
Lot # 05 |
87,000 |
|
|
6 |
DCRIP /GOODS/NCB/26 |
Lot # 06 |
110,000 |
|
|
7 |
DCRIP /GOODS/NCB/27 |
Lot # 07 |
850,000 |
Lot # 01 i) Supplying and installation Electrical Resistivity Survey (ERS) Meter
LOT # 2 i) Supplying and installation Deep water well inspection camera
ii) Supplying and installation of Online Groundwater Monitoring Unit
iii) Supplying and installation of Groundwater Level Indicator
iv) Supplying and installation ofWater Level Indicator Plus Conductivity meter
III. LOT # 3 i) Supplying and installation of EC/TDS meter Hanna or equivalent brand portable
ii) Supplying and installation of Double Beam Spectrometer
iii) Supplying and installation of Ph meter portable Hanna or equivalent brand
IV. LOT # 4 i) Supplying SCHMIDT HAMMER / Rebound Hammer
ii) Supplying and installation Sediment Lab Tools (Samplers including BMH-53, DH-48, D-48, BM-54 along with all accessories)
V. LOT # 5 i) Supplying of Highly Accurate Imported GPS
VI. LOT # 6 i) Providing and Installation of ArcGIS Desktop software (Basic) Old
Name: ArcView Ver. 10.7 appropriate training to research staff.
ii) Providing and Installation of GEO tec. PM software (Geotechnical
Engineering Project Management Software for small Business) i/c
appropriate training to research staff.
iii) Providing and Installation of Processing MODFLOW software
(Processing Mod Flow 8.047 Full Version-Single user) i/c appropriate
training to research staff.
iv) Providing and Installation ofLicensed windows 10 pro
v) Providing and Installation of Licensed latest Microsoft Office professional 2016
VII. LOT # 7 i) Supplying and installation of Data logger.
ii) Supplying and installation of Wireless access router
iii) Supplying and installation PTZ Camera
iv) Supplying and installation DVR Console
v) Supplying and installation of Data Recording Cabin with necessary items
vi) Supplying and installation Digital Hook & Point Gauges.
vii) Supplying and installation Wave Supplying and installation Water Level Electronic Float Gauges.
3. Interested eligible bidders may obtain further information and inspect the bidding documents at the office of Project Director (PIU), Punjab Irrigation Department, House No. 337-B, Canal View Housing Society near Thokar Niaz Baig, Lahore, Pakistan. Tel: +92-42-35294372 Fax: +92-42-35294371.
4. A complete set of bidding documents containing specification for all lots may be purchased by interested bidders on the submission of a written application to the addressed below and upon payment of a nonrefundable fee of PKR 3,000(Pak. Rupees Three Thousand Only). The method of payment will be through cash deposit.
5. The provisions in the Instructions to Bidders and in the General Conditions of Contract are the provisions of the World Bank Standard Bidding Documents: Procurement of Goods for National Competitive Bidding, Pakistan, Part One.
6. The bidder should provide only one quotation for each/any lot individually and the bidder must apply/quote for entire lot, and cannot pick and choose any particulars item/items within a lot. The bidder can also submit quotations for more than one lot.
7. The deadline for receipt of bid(s) by the bidders is before/upto 12:30 PM on March 4, 2020and must be accompanied by a bid security as pointed out in afore mentioned table.
8. Bids will be opened, in the presence of bidders’ representatives who choose to attend bid opening event, as per their respective time schedule mentioned in afore referred table at 01:00 PM on March 4, 2020IN THE OFFICE OF Project Director, Project Implementation Unit addressed House No. 337 B, Canal View Housing Society near Thokar Niaz Baig Lahore.
9. The bidders are requested to give their best and final prices as no negotiations are expected.
10. All the bids must be accompanied by a Bid Security of above-mentioned lots, which are not exceeding Five percent of the estimated price as per the rule 27 of Punjab Procurement Rule 2014.
Project Director (PIU),
Punjab Irrigation Department, House No. 337-B,
Canal View Housing Society near Thokar Niaz Baig,
Lahore, Pakistan.
Tel: +92-42-35294372
Fax: +92-42-35294371
Web site: irrigation.punjab.gov.pk

The World Bank (USA) is part of an international financial agency that makes loans and grants to governments in low- and middle-income countries to fund capital projects. The United States was a driving force behind the founding of the World Bank in 1944 and it is still the World Bank's largest shareholder today.
The United States contributes to tackling critical international development concerns through the World Bank Group and has a long history of generously supporting the objectives of the World Bank Group and has been a champion of the International Development Association (IDA) which provides low-interest loans and grants to the world's poorest countries. The key U.S. priorities at the World Bank include a multilateral health and economic response to COVID-19, debt sustainability and transparency, promoting governance and fighting corruption, ending energy poverty and supporting a strong emphasis on accountability, transparency and development impact.
Focuses on protecting natural ecosystems, promoting sustainable resource management, enhancing climate resilience, and mitigating the impacts of climate change through conservation, adaptation, and low-carbon initiatives.
Supports initiatives that ensure access to safe water, sanitation systems, and hygiene services to improve public health and living conditions.