
Angola Learning for All Project: Acquisition of equipment for the TV and Radio studio for MED
- Funding agency:
- WB
- Status:
- awarded
- Location:
- Angola

The Government of the Republic of Angola has received financing from the International Development Association (IDA) toward the cost of the Water Sector Institutional Development Project (WSIDP), and intends to apply part of the proceeds for consultant services. The services include: (a) checking the design to be prepared by the Contractor for the construction works of N'Dalatando water network, comprising the design and construction in two phases of 43 kilometres of primary and secondary network and 7 000 household connections, including excavation, laying of pipes with all accessories and back filling including testing and commissioning (b) the site supervision of the works on site according to its design acting as the "The Engineer" and "Engineer's Representative" all in accordance with the Contract Conditions and the Environmental and Social Management Framework for the Water Sector Institutional Development Project and Resettlement Policy Framework - ESMF/RPF safeguard documents and local environmental and social legislation. The design and construction period is approximately 24 months. The Financial and Contract Management Unit (FCMU) of the National Directorate for Water Supply and Sanitation (DNAAS) of the Ministry of Energy and Water (MINEA) now invites eligible consultants to indicate their interest in providing the services. Interested consultants must provide information indicating that they are qualified to perform the services (brochures, description of similar assignments, experience in similar conditions, availability of appropriate skills among staff, etc.). Consultants may associate to enhance their qualifications. A consultant will be selected in accordance with the procedures set out in the World Bank's Guidelines: Selection and Employment of Consultants by World Bank Borrowers (current edition). Interested consultants may obtain further information at the address below during office hours from 08.00 am to 03.00 pm. Expressions of interest must be delivered to the address below on or before 03.00 pm, February 28th 2011. Contact: Ministry of Energy and Water (MINEA). National Water Directorate for Water Supply and Sanitation (DNAAS). Financial and Contract Management Unit (FCMU). Attn: Mr. Lucrecio Costa. Rua Moises Cardoso Kami, No. 25 - 2º andar. Predio J. Pimenta. Luanda, Angola. Tel: (244-935) 148-868; (244-928) 118-001. Fax: (244-222) 339-988, (244-222) 339-335. E-mail: [email protected]; Notice Number: WB718-793/11
The World Bank (USA) is part of an international financial agency that makes loans and grants to governments in low- and middle-income countries to fund capital projects. The United States was a driving force behind the founding of the World Bank in 1944 and it is still the World Bank's largest shareholder today.
The United States contributes to tackling critical international development concerns through the World Bank Group and has a long history of generously supporting the objectives of the World Bank Group and has been a champion of the International Development Association (IDA) which provides low-interest loans and grants to the world's poorest countries. The key U.S. priorities at the World Bank include a multilateral health and economic response to COVID-19, debt sustainability and transparency, promoting governance and fighting corruption, ending energy poverty and supporting a strong emphasis on accountability, transparency and development impact.
Focuses on protecting natural ecosystems, promoting sustainable resource management, enhancing climate resilience, and mitigating the impacts of climate change through conservation, adaptation, and low-carbon initiatives.
Focuses on planning, developing, and managing urban areas and housing systems to create sustainable, inclusive, and livable cities.