Invitation for Prequalification
Republic of Kazakhstan
Loan 8156-KZ
East-West Roads Development Project
Reconstruction of the Road Section "Balkhash-Burylbaital"
ICB No.: EWRP-1855-2152-ICB (W)-001/2017
The Republic of Kazakhstan has received a loan from the International Bank for Reconstruction and Development (IBRD) toward the cost of the East -West Roads Development Project and intends to apply a part of the proceeds of this loan to payments for civil works under the contract for reconstruction of the "Balkhash-Burylbaital" (6 contracts) road section with total length of 297 km.
The Committee for Roads of the Ministry for Investments and Development (hereinafter "Committee"), an entity in charge of the Project implementation, intends to prequalify potential Contractors for the 6 (six) contracts for reconstruction of the road section detailed below:
Lot 1: Reconstruction of the road transferring from two lanes to four lanes, km 1855-1905 with total length of 50 km. Construction works are expected to start in the beginning of 2018 and will continue for 34 months.
Lot 2: Reconstruction of the road transferring from two lanes to four lanes, km 1905-1955 with total length of 50 km. Construction works are expected to start in the beginning of 2018 and will continue for 29 months.
Lot 3: Reconstruction of the road transferring from two lanes to four lanes, km 1955-2005 with total length of 50 km. Construction works are expected to start in the beginning of 2018 and will continue for 29 months.
Lot 4: Reconstruction of the road transferring from two lanes to four lanes, km 2005-2069 with total length of 64 km. Construction works are expected to start in the beginning of 2018 and will continue for 37 months.
Lot 5: Reconstruction of the road transferring from two lanes to four lanes, km 2069-2105 with total length of 36 km. Construction works are expected to start in the beginning of 2018 and will continue for 27 months.
Lot 6: Reconstruction of the road transferring from two lanes to four lanes, km 2105-2152 with total length of 47 km. Construction works are expected to start in the beginning of 2018 and will continue for 27 months.
Prequalification will be conducted through prequalification procedures specified in the World Bank's Guidelines: Procurement under IBRD Loans and IDA Credits, January 2011, and is open to all Applicants from eligible source countries, as defined in the Guidelines.
Interested eligible Applicants may obtain further information from and inspect the Prequalification Document (PQD) from the Committee (at the address below) from 9:30 to 18:00 hours, Astana time.A complete set of the PQD in English can be received in hard copy or electronically upon submission of a written request to the Committee by an interested eligible Applicant signed by the authorized representative on the letterhead of the Applicant's Company.
Applicants may apply for any one lot or a combination of lots. Applications for Prequalification in sealed envelopes shall be delivered to the address below by 16:00 (Astana time) on Monday, October 2, 2017 and be clearly marked:
LOAN 8156 KZ, EAST-WEST ROADs development PROJECT
BALKHASH - BURYLBAITAL SECTION: ЕWRP-1855-1905- ICB(W/1)-001/2017
or/and
LOAN 8156 KZ, EAST-WEST ROADs development PROJECT
BALKHASH - BURYLBAITAL SECTION: ЕWRP-1905-1955- ICB(W/2)-001/2017
or/and
LOAN 8156 KZ, EAST-WEST ROADs development PROJECT
BALKHASH - BURYLBAITAL SECTION: ЕWRP-1955-2005- ICB(W/3)-001/2017
or/and
LOAN 8156 KZ, EAST-WEST ROADs development PROJECT
BALKHASH - BURYLBAITAL SECTION: ЕWRP-2005-2069-ICB(W/4)-001/2017
or/and
LOAN 8156 KZ, EAST-WEST ROADs development PROJECT
BALKHASH - BURYLBAITAL SECTION: ЕWRP-2069-2105 - ICB(W/5)-001/2017
or/and
LOAN 8156 KZ, EAST-WEST ROADs development PROJECT
BALKHASH - BURYLBAITAL SECTION: ЕWRP-2105-2152- ICB(W/6)-001/2017
Mr. Amir Karimbaev, Head of the Project Preparation Division
Committee for Roads, Ministry for Investments and Development
32/1 Kabanbay Batyr Ave., Transport Tower, 6th Floor, Office 612
010000 Astana city, Republic of Kazakhstan
Tel: +7 (7172) 75 46 40
E-mail: [email protected]; [email protected]

The World Bank (USA) is part of an international financial agency that makes loans and grants to governments in low- and middle-income countries to fund capital projects. The United States was a driving force behind the founding of the World Bank in 1944 and it is still the World Bank's largest shareholder today.
The United States contributes to tackling critical international development concerns through the World Bank Group and has a long history of generously supporting the objectives of the World Bank Group and has been a champion of the International Development Association (IDA) which provides low-interest loans and grants to the world's poorest countries. The key U.S. priorities at the World Bank include a multilateral health and economic response to COVID-19, debt sustainability and transparency, promoting governance and fighting corruption, ending energy poverty and supporting a strong emphasis on accountability, transparency and development impact.
Comprises initiatives that develop and maintain road transport infrastructure to improve connectivity, safety, and mobility for people and goods.
Encompasses the planning, design, construction, and maintenance of the physical and naturally built environment and public works within the built environment.