Dhaka Mass Rapid Transit Development Project (Line-5): Southern Route
Project Summary:
The project involves the construction of a 17.2 km mainline (13.1 km underground and 4.1 km elevated) with 15 stations and a depot for Dhaka's MRT Line-5. This is a major infrastructure development aimed at improving mass transit in Dhaka, Bangladesh.
Client: Dhaka Mass Transit Company Limited (DMTCL)
Funding:
- Asian Development Bank (ADB) for civil works (CP-01 to CP-05)
- Economic Development Cooperation Fund (EDCF) of KEXIM for DSI packages (CP-06 to CP-09)
Project Duration: 84 months (7 years)
Total Estimated Cost for Consultancy Services: USD 97,455,524
Key Deliverables:
- Construction supervision for all civil work packages (CP-01 to CP-05)
- Supervision of design-build construction works for DSI packages (CP-06 to CP-09)
- Design modifications and checks as required
- Integration of ERMS into DMTCL's corporate-level ERMS
- Interface management and coordination with other MRT Lines
- Utility Relocation works supervision
- Development of TOD and station plaza coordination
- Security assessment and risk mitigation plan review
- Overall system integration management
- Environmental Management Plan (EMP) implementation and monitoring
- Traffic Management Plan (TMP) implementation and updates
- Capacity building through training, workshops, and seminars
- Operation and maintenance preparation support
- Non-rail business development strategies
- Physical and financial progress monitoring and forecasting
- Services during the defects notification period
Key Experts Required:
- Team Leader
- Additional Team Leader System
- Civil Engineering Specialists
- Railway Systems Specialists
- Environmental Specialists
- Occupational Health and Safety (OHS) Specialists
- Resident Engineers for each construction package
- Inspectors for each construction package
- Procurement Specialists
- Various other engineering and management specialists
Important Deadlines:
- Expression of Interest (EOI) Submission Deadline: August 27, 2024