Share
Print
On 5th November, the third release of the Q&A document was added to this website under each of the topics. Please refer to the section “Topic conditions and documents” in the topic pages.
On 2nd October, the second release of the Q&A document was added to this website under each of the topics. Please refer to the section “Topic conditions and documents” in the topic pages.
On 16th September, the first release of Q&As document was added to this website. Please refer to the section “Topic conditions and documents” in the topic pages.
Topic identifier: | JTI-CS2-2015-CFP02-FRC-02-10 | ||
Publication date: | 23 July 2015 | ||
Types of action: | CS2-IA Innovation action | ||
DeadlineModel: Opening date: |
single-stage 30 July 2015 |
Deadline: | 18 November 2015 17:00:00 |
Time Zone : (Brussels time) |
To adapt an existing rig, to enable simultaneous mechanical testing of main and side gear box modules as needed for Permit to Fly of the LifeRCraft demonstrator. This rig must accomodate the non conventional mechanical architecture of this demonstrator and save energy, requiring low power input (back-to-back architecture). Please refer to the full and formal topic descriptions published in this call.