GRANT 54377-002 NAU: Sustainable and Resilient Urban Development Project - CS-02 Consultant Supervision (Water Supply, Sanitation, and Solid Waste Works)
Date Published: 03-Oct-2024
Deadline of Submitting EOI: 17-Oct-2024 11:59 PM Manila local time
SELECTION PROFILE
Consultant Type: Firm
Selection Method: Quality and Cost-Based Selection (QCBS)
Selection Title: Sustainable and Resilient Urban Development Project
Package Number: CS-02
Package Name: Consultant Supervision (Water Supply, Sanitation, and Solid Waste Works)
Engagement Period: 48MONTH
Consulting Services Budget: USD 2,065,000
Source: International
Technical Proposal: Full Technical Proposal (FTP)
Estimated Commencement Date: 01-Jul-2025
ADDITIONAL INFORMATION
Country of assignment: Nauru
TERMS OF REFERENCE
Primary Expertise: Consultant Supervision (Water Supply, Sanitation,
and Solid Waste Works)
TOR Keywords: supervision consultant
Objective and Purpose of the Assignment
The Nauru Sustainable and Resilient Urban Development Project (SRUDP) will support the Government
of Nauru in increasing sustainability, resilience, access, quality, and safety of urban services
for 1,962 households across Nauru. The project will (i) improve the resilience of the water supply
for high density areas by building a new reticulated water supply network and strengthening the
quality, safety, and reliability of the non-reticulated water supply system across Nauru; (ii)
build a water transfer system from existing desalination plants to the new reticulation network
with associated facilities; (iii) develop an assessment, improvement, and maintenance scheme for
private household rainwater storage systems throughout the country to promote resilience, through
water source diversification, and prepare a periodic maintenance plan for the future; (iv) build a
new septage treatment system; (v) develop an assessment and maintenance scheme for on-site
sanitation systems throughout Nauru and prepare a periodic maintenance plan for the future; (vi)
decommission the existing national sanitation facility; (vii) build a composting and solid waste
recycling center to support a circular economy; and (viii) strengthen the enabling environment,
institutional capacity, resilience, and the financial sustainability of the utilities.
The project outputs are as follows:
• Output 1: Climate resilient, safe, sustainable, and efficient water supply system developed.
• Output 2: Climate resilient, safe, sustainable, and efficient septage treatment plant, collection
and transport system developed
• Output 3: Composting and waste recycling systems for circular economy developed
• Output 4: Enabling environment, institutional capacity, resilience, and financial sustainability
of utilities strengthened
The works and services to be funded by the project have been selected to best address the impacts
and meet the outcomes and outputs within the available funding. The ADB project documents in the
Terms of Reference (TOR), Appendix C: Project Documents provide further guidance on the project
impact outcomes and outputs.
The construction supervision consultant (CSC) will be engaged for the project construction and
defect notification periods. This may be extended subject to the ongoing need for a CSC, the
satisfactory performance of the CSC and the agreement of both parties. The components of the
project assigned to the CSC will be delivered within Nauru. Given the nature of this consultancy
the people engaged in CSC activities shall be located in Nauru for the majority of their working
time. Please refer to the attached TOR.