Packaging, transportation and disposal of PCB containing equipment and PCB oil (estimated total of 45,980 tons of PCB transformers, 3,743 tons of PCB capacitors and 1,15 tons of PCB oil in barrels)
Details
Associated tenders • 0
Status
Date
Description
Overview :
PCB containing equipment and PCB oil will be handed over for disposal within the Project. The transformers and capacitors will be disconnected and together with the steel barrels containing PCB oil will be stored in the territory of the company (hereinafter – Owner) holding the equipment. The Contractor will have to provide safe packaging of PCB equipment and PCB oil, performed on site, safe transportation to the final destination, and disposal.
The whole volume of PCB equipment and PCB oil will be available at the site for packaging and transportation not later than as of December 1st, 2008.
The technical specifications of PCB equipment and PCB oil and the site, including photos and description of the logistics available, is provided in Annex IV of RFP. The Owner will provide the equipment necessary for lifting and loading of the PCB equipment and PCB oil.
The company holding the PCB equipment and PCB oil is located at:
Daugavpils (city), Latvia