Reconstruction Credit Institute /Kreditanstalt fur Wiederaufbau (HQ)

Design and Build Works for Tam Hiep Wastewater Treatment Plant and Construction of Wastewater Disposal System

Last update: Sep 26, 2019 Last update: Sep 26, 2019

Details

Location:Vietnam
Vietnam
Category:Works
Status:Cancelled
Sectors:Civil Engineering, Water & Sanitation
Contracting authority type:Government / Public Sector
Eligibility:Organisation
Budget:N/A
Date posted: Aug 17, 2018

Attachments 2

Associated Awards

Project cycle timeline

STAGES
EARLY INTELLIGENCE
PROCUREMENT
IMPLEMENTATION
Cancelled
Status
Programming
Formulation
Approval
Forecast
Open
Closed
Shortlisted
Awarded
Evaluation

Description

Design/Construction Services, Wastewater Treatment Plant/Wastewater Disposal System

Expression of Interest/Prequalification

  • Deadline: Sep 17, 2018
  • Country: Vietnam

Project Name: Urban Environment Improvement in Chu Lai Nui Thanh

Package XL1: Design and Build Works for Tam Hiep Wastewater Treatment Plant and Construction of Wastewater Disposal System

Ref.-No. UEI-CLNT/VN/KfW/CW/PXL1/2018-PQ

Short description:      

Qualified Contractors or Joint Ventures are invited to submit a prequalification document for procurement of works for the design, manufacture, construction, installation and commissioning of a 5,000 m3/day wastewater treatment plant involving SBR technology and sludge treatment, with civil works provisions for extension to 10,000 m3/day; as well as the construction of the associated wastewater collection network, including three (3) sewerage pumping stations. The wastewater disposal system is based on a separate system for sewerage collection and treatment.

Want to unlock full information?
Member-only information. Become a member to access this information. Procurement notices from over 112+ donors and banks are available here