Reconstruction Credit Institute /Kreditanstalt fur Wiederaufbau (HQ)

Consulting Services, Sewage and Wastewater Treatment in Provincial Cities

Last update: Dec 22, 2023 Last update: Dec 22, 2023

Details

Location:Peru
Peru
Category:Consulting services
Status:Awarded
Sectors:Procurement, Civil Engineering, Water & Sanitation
Languages:English, Spanish
Contracting authority type:Government / Public Sector
Eligibility:Organisation
Budget:N/A
Date posted: Aug 5, 2022

Attachments 3

Associated Awards

Project cycle timeline

STAGES
EARLY INTELLIGENCE
PROCUREMENT
IMPLEMENTATION
Cancelled
Status
Programming
Formulation
Approval
Forecast
Open
Closed
Shortlisted
Awarded
Evaluation

Description

Consulting Services, Sewage and Wastewater Treatment in Provincial Cities

Prequalification

Country Peru
Deadline Sep 20, 2022
Financing KfW Entwicklungsbank
Reference Number BMZ201266543
Subject Programa PTAR II, Servicios de Consultoría para la Implementación del Programa Sectorial de Alcantarillado y Tratamiento de Aguas Residuales en Ciudades de Provincias del Perú
Project Objectives:

The objective of the "Sector Program for Sewage and Wastewater Treatment in Provincial Cities" ("WWTP Program") is to increase the coverage of adequate and sustainable treatment of wastewater and sustainable access to sewerage services in cities of provinces. For this, the Program prioritizes investments aimed at construction, rehabilitation, optimization and/or expanding wastewater treatment plants.
Project Measures:

Sewerage: Installation of primary and secondary collectors in diameters between 200mm and 1,500mm with a total length of 36.19km, installation of six (6) pumping stations with flows between 100 and 2,434l/s.
WWTP: Average flow to horizon 2044 of 1,112l/s with maximum hourly flow of 1,958l/s, screening, grit trap, settler, (micro-) filtration, UV disinfection.
Final disposal: Terrestrial outfall with a total length of 6,592.00m, includes tunnel work of 1,320.00m crossing La Península hill towards the sea, submarine outfall of 1,000m in length at depths up to 50m with a diameter of DN 1,400mm.
Sludge line: Anaerobic digestion of sludge and cogeneration of electrical energy.
Requested Services:

Analysis of existing studies and fieldwork and determination of additional fieldwork/studies to be subcontracted in the initial phase of the consultancy, e.g. topography survey, geotechnical work, biodiversity study (Villa María wetland and marine ecology) and others
Prepare bidding documents for the works/services based on a FIDIC yellow/gold book contract under which the Works Contractor will also be responsible for the detailed design and assisted operation of the WWTP for three years
Assist the Contracting Party in the tender and award of the detailed design, construction, and assisted operation contract
Supervise the elaboration of the detailed designs and the execution of the works in charge of the Contractor
Supervise the start-up of the executed works and the assisted operation for three years by the Contractor
Advise on the delivery of works/services (Reception of work) and supervision of repair of defects, within the framework of the Construction Contract
Supervise the assisted operation, validating the operability of the executed works
Settle the executed works, within the framework of the Construction Contract