European Commission Directorate-General for International Partnerships (EuropeAid HQ)

Maritime Ports – Works or Mixed

Last update: Nov 29, 2022 Last update: Nov 29, 2022

Details

Location:EU 27
EU 27
Contracting authority type:Development Institution
Status:Awarded
Budget:N/A
Award ceiling:N/A
Award floor:N/A
Sector:Water Navigation & Ports & Shipping, Transport
Eligible applicants:Unrestricted / Unspecified
Eligible citizenships:Bulgaria, Croatia, Cyprus, Czech ...
See more
Bulgaria, Croatia, Cyprus, Czech Republic, Estonia, Greece, Hungary, Latvia, Lithuania, Malta, Poland, Portugal, Romania, Slovakia, Slovenia
Date posted: Sep 17, 2021

Attachments 2

Associated Awards

Description

Call Updates

Jul 5, 2022 4:31:34 PM
CALL UPDATE: FLASH EVALUATION RESULTS

EVALUATION results

Published: 16/09/2021

Deadline: 19/01/2022

Indicative available budget: EUR 2.000.000.000

The results of the evaluation are as follows:

Number of proposals submitted: 55

Total funding requested for submitted proposals: EUR 5.023.061.712

Number of inadmissible proposals: 1

Number of ineligible proposals: 7

Number of selected proposals: 18

Total recommended funding for selected proposals: EUR 2.421.314.745

We recently informed the applicants about the evaluation results for their proposals.

For questions, please contact CINEA-CEF-TRANSPORT-CALLS@ec.europa.eu


Sep 24, 2021 4:09:04 PM

The submission session is now available for: CEF-T-2021-CORECOEN-MARP-WORKS(CEF-INFRA)


Maritime ports – works or mixed

TOPIC ID: CEF-T-2021-CORECOEN-MARP-WORKS

Programme: Connecting Europe Facility (CEF)
Work programme part: CEF-2021
Call: CEF 2 Transport - Projects on the Core Network – Cohesion envelope (CEF-T-2021-CORECOEN)
Work programme year: CEF-2021
Type of action: CEF-INFRA CEF Infrastructure Projects
Type of MGA: CEF Action Grant Budget-Based [CEF-AG]
Deadline model: single-stage
Opening date: 16 September 2021
Deadline date: 19 January 2022 17:00:00 Brussels time

Topic description
 
Objective:

The objective is to develop infrastructure projects in maritime ports on the Core Network of the TEN-T.

Scope:

Works on core maritime ports, with the possibility to include studies, related to:

  • port access aiming at providing safe maritime access in the form of breakwaters, access channels, fairways, locks and navigational aids;
  • basic port infrastructure, with a priority on: 
    • development of zero or low-emission multimodal solutions, or;
    • development of ports´ capacities and facilities in relation with offshore wind farms, or;
    • improving connectivity of remote, insular or outermost regions (as defined in Article 349 TFEU) or of Member States with no land border with another Member State;
  • shore-side electricity supply;
  • port reception facilities for oil and other waste (including residues from exhaust gas cleaning systems) to meet environmental requirements;
  • ensuring year-round navigability by means of capital dredging and ice-breaking facilities;
  • providing or improving road/rail access and connections within maritime ports.

Support will not be given to infrastructure dedicated for cruise ships, except as regards shore-side electricity supply.

Hinterland connections to the maritime ports are covered by the respective transport mode priorities but may be part of a single Action (for instance an Action improving the rail access both within and outside the port area).

The basic infrastructure for development of zero or low-emission multimodal solutions could include basic infrastructure for improving the interconnection between the maritime transport and inland waterways.

In accordance with Article 9(2)(a)(i) of the CEF Regulation, Actions addressing the Core Network may include related elements on the Comprehensive Network, when necessary to optimize the investment. These elements may form up to 10% of the total eligible costs of the Action and shall be presented as a separate work package.

Facilities and infrastructure supported under CEF must be accessible for use by all operators on a non-discriminatory basis.

The foreseen duration of the action should be 4-5 years maximum.

Want to unlock full information?
Member-only information. Become a member to access this information. Procurement notices from over 112+ donors and banks are available here